Source:
Time:2019-10-07
Read:306
The National Day holiday is approaching, in order to ensure that the boss after the holiday sweep function fast movement and stable production, remember to do a good job of equipment maintenance before the holiday oh ~
1. Cleaning up before the festival:
A. Vacuum drainage
Turn on the automatic washing machine to clean the vacuum pipe. After cleaning, turn on the vacuum adsorption, absorb the remaining grinding water in the pipe, and then click on the vacuum drainage, discharge for 3 times consecutively to ensure that the vacuum pipe is cleaned, so as not to cause vacuum blockage.
B. Clean the machine tool processing area
Clean table, fixture, bed and other areas prone to residual debris, wipe all exposed surface until no grinding and chip accumulation.
C. Clean up the disc and working disc
Clean discs, work plates, etc., until there is no dust and dirt.
D. Clean the polishing liquid tank
Pump the polishing liquid into the collection container, rinse the polishing liquid tank, ensure that there is no residual liquid and residue, dry the box, motor and pump body. So as not to precipitate and solidify the grinding powder after the section, the pump is overloaded during operation, and the pump is burned out.
E. Add lubricant to guide rail and gear, so as to avoid rust after the festival.
2. Daily and regular maintenance
During the holiday, if you need to contact, please contact our business window.
After-sales service special line:
Manager Tan: 139-2743-9979
Manager He: 185-2086-9641
Finally, I wish you all the best, everything goes well, happy National Day!
Li Yeming 135 5490 0907
Company Office Number:0755-23212431
Company Fax:0755-27356481
Company address:Kaixinda Science Park, No. 49, Zhoushi Road, Shiyan Street, Bao'an District, Shenzhen
Learn more about Xikoe
szxikoe